Showing posts with label West Hollywood. Show all posts
Showing posts with label West Hollywood. Show all posts

Thursday, May 27, 2021

Link the coming Sunset and La Cienega Bus Rapid Transit Corridors

 Here is a Metro Los Angeles map of potential transit corridors for possible upgrade to Bus Rapid Transit.   



Metro  recently released it's top five priorities for Bus Rapid Transit corridors.



The La Cienega BRT Line would run from Slauson to Santa Monica Blvd.  Why not link this BRT Line  to the new proposed Sunset - Cesar Chavez BRT Line via Santa Monica Blvd. and/or Sunset Blvd.?



That map may off on scale, but a BRT Line between the ocean - Venice - La Cienega - San Vicente - Santa Monica - Sunset - Cesar Chavez - Union Station sounds pretty cool, doesn't it?  Actually that alignment works really well as a streetcar/tram too.

(As a side note, La Brea is also targeted for future BRT.  Well, if La Brea is already getting BRT, then surely the Crenshaw Metrorail Northern Extension project should flow at least as westerly as Fairfax.  La Brea doesn't need both, especially when we compare a potential stop to serve The Grove / Television City at Beverly & Fairfax, versus the two gas stations and a car rental at Beverly & La Brea.)


Tuesday, August 4, 2020

Revitalizing West Hollywood After the Pandemic

I've been doing a lot of walking around West Hollywood to get my 10,000 steps in daily and I am distressed by the number of closed and vacant storefronts I see on my routes.  Not just stores, but bars and other entertainment venues are shutting down.  This is causing great concern among people who love this city.



"And the Band Played On" in the Micky's photo s an ominous reference to the last pandemic which is not over, by the way.  HIV/AIDS is still a thing.  (Please check out Randy Shilt's amazing book and the Emmy-winning TV movie if you have never read or seen either.)

When this new pandemic hit it was unknown if we were going to be able to bounceback rapidly from shutting down as we hoped.  It is now clear that this is not the case.  Much of this has been beyond the City of West Hollywood's control.  We have a incompetent and corrupt President who treated Coronavirus like a "hoax" and failed to take the necessary actions to control the virus, which meant the economy could not recover quickly.  Re-opening a country too soon that did not shut down properly, not only did not spur the economy, it spurred the virus.  We also have a giant chunk of seemingly delusional people who treat COVID-19 as if it were simply overblown media hype or think that mask-wearing and social distancing shouldn't apply to them because they are special or infringes on their "freedumb" to infect other people.

So, lacking the leadership and social solidarity of countries like New Zealand, South Korea, Germany, and Japan, America is in for a long slog where over 200,000 will likely perish from COVID-19 by November and the American economy continues its spiral into its worst downturn since the Great Depression.


Many people who live in or love West Hollywood are asking themselves, 'What kind of city will we come back to when we finally emerge out of this pandemic and the resulting economic catastrophe?"  In particular, there is concern that West Hollywood's two great entertainment zones, the Rainbow District and the Sunset Trip, will lose their unique characters and become generic and no longer representative of their respective histories.  

Some businesses are making the best of this situation.

At Block Party WeHo, it is "Pride All Year Long", and they have begun setting up shop outdoors.


Even Yogurt Stop is getting into the act.  


I am all for this adaptation.  Hopefully, businesses like these will be able to survive and that indoor shopping will return before the rain starts.

Many restaurants who are lucky enough to have outside seating are able to use that to serve customers.  Some which have not had outside seating before have converted parking lots seating.  Hamburger Mary's has recreated its fun atmosphere outside.  It was fun enjoying the music at atmosphere.  Hey, I'm open to drag bingo outdoors at night.


The Sunset Strip has been quiet during the shutdown, but Carney's is still serving a great chili dog.


However, if it is going to be several months or a couple of years before a vaccine, and even longer before the economy bounces back, what is going to happen to the Rainbow District and Sunset Strip, particularly to its empty storefronts and shuttered nightlife?  Will it be generic chains that slap a rainbow flag or guitar sticker on the door that come in and we simply call it a day?  What about the small businesses that made this city great?   What can the City of West Hollywood do about this?

Of course, the Federal government has certain powers, our state governments have certain powers, and local governments are given certain powers by our states in our federal system in America.  The City of West Hollywood cannot control the overall national economy, nor can we tell a private property or business owner what to do with their asset, but we can try to encourage and influence how we want our entertainment districts to revive with how we design our public spaces and approve planning and permits.

I don't have all the answers for revitalizing our entertainment districts, nor should any one person determine how this is to happen.  But here are my suggestions for moving forward and at least getting the process started:

(1) I suggest the City establish an official Rainbow District Task Force and a Sunset Strip Task Force asked to coming up with a series of recommendations and action items on how to economically revitalize while still maintaining the historical character of these two entertainment zones.  These Task Forces are not about creating new administrative layers, but about engaging the community.  The revitalization of the Sunset Strip and Rainbow District after the pandemic should include input from all its stakeholders. Excite the community by involving the community.  An excited community leads to prosperous local businesses too.  

(2) I suggest expanding the mandate of the Arts & Cultural Affairs Commission to the "Arts, Cultural and Entertainment Affairs Commission" so there is a standing body in the City to review fun, creative public nightlife events for the City to help things along.  Perhaps we could allow street buskers on Sunset Strip and drag queens to perform for the public in the Rainbow District, as examples.

(3) I suggest the City establish an Affordable Housing Task Force that will be asked to recommend methods of creating more affordable housing for artistic and creative people who are currently priced out of living in West Hollywood.  For example, there may be non-traditional types of housing such as loft spaces, communal spaces, converted empty commercial spaces, SRO's, that we designate for people in the arts and entertainment industry. 

(4) I suggest establishing a Public Banking Commission.  California passed a new law authorizing municipalities to establish public banks which can use their funds to reinvest in their communities.  West Hollywood should jump on this new opportunity.

(5) I recommend The Pick Up Line entertainment shuttle be rerouted so the western turnaround takes people up to the Sunset Strip as seen below, and perhaps join with the City of Los Angeles for a "Super Entertainment Shuttle" (see previous blog post) that includes Hollywood and Theatre Row.

Proposed new Pickup Line alignment
 
Proposed Entertainment Supershuttle alignment

Revitalizing the Sunset Strip and Rainbow District isn't only about preserving the character and culture of West Hollywood, as important as that is in itself.  It's also about preserving the tax base that pays for our quality services.  At my last glance, the city's hotel tax is its largest revenue source, and if we want people to lodge in our hotels, we need to give them incentive to spend the night in our fun, creative city.

Here is some good news.  There will always be change.  Businesses and people come and go in life.  Here is one that opened in mid-city area.  I can recommend the coffee at gget ("Go Get 'Em Tiger").  Don't lose heart.  Happy Days will someday be here again.


There is an election in November.  I'm not running for anything, but I invite all the candidates who are running to share with us their ideas for revitalizing the Rainbow District and Sunset Strip when we finally emerge from this horrible pandemic and resulting economic devestation.

What do you think?

Sunday, August 2, 2020

A Proposal for a New Entertainment Shuttle for Hollywood & West Hollywood

In West Hollywood, pre-pandemic, West Hollywood had two free entertainment shuttles which ran Friday and Saturday nights, the Pick Up Line and the Sunset Trip.  (The Pick Up line also ran on "Sunday fundays" and certain holidays.).

The advantages of a free shuttle service serving nightlife are obvious.  It reduces the amount of traffic in the area, reduces drunk driving, reduces the demands on parking, and provides more customers to businesses in these districts.  These free shuttles ran old trolley cars and played hip music and have a fun atmosphere too them.  You can see their respective routes below:



Eventually, whenever things re-open again at some point in the future, and nightlife returns again, West Hollywood can bring back entertainment shuttle service.  Unfortunately, post-pandemic, there are not funds to operate both shuttles.  The Pick Up Line will return first when things re-open again in the future.  

A proposal I have is to modify the Pick Up route, so the western turn around also serves a part of Sunset Blvd.  This will take people up the hill to part of the western Sunset Strip and provide shuttle service to places like the Roxy, the Whisky-a-Go-Go, the Rainbow Room, and the Viper Room, among others, as seen below;


For future planning, I want to propose something bigger and grander involving both Hollywood and West Hollywood.  A "Super Entertainment Shuttle" if you will.  It would serve the Rainbow District, the Sunset Trip, and currently unserved "Theatre Row", as well as taking people to clubs in Hollywood and the "B Line" ("Red Line") Subway.  I envision both a clockwise and a counterclockwise loop.  Please see below.


Two notes:  (1)  I'm currently envisioning the entertainment shuttle heading north from Sunset to Highland rather than LaBrea, because Hollywood Blvd. is often a standstill between Highland and LaBrea on Friday/Saturday nights;  (2) Also, those numbered blue dots are mileage markers, not proposed stops.  The whole loop is slightly under ten miles.   

Granted, this shuttle would require cooperation between both the Cities of Los Angeles and West Hollywood, and it will be months before all of these types of businesses re-open.  But we plan for the future today.  

Imagine someone taking the Red Line to Hollywood, to then catch the shuttle to see a play on Theatre Row or a set at The Comedy Store; and then heading for a drink at The Rainbow Room, or Mickey's; and then head back to the subway, having left the car at home.

What do you think?

Wednesday, July 22, 2020

Revisions to Metro's NextGen Bus Plan

Here is the good news.  After community outreach, Metro has made some revisions to its NextGen Bus Plan, and Line 218 has been saved, albeit in truncated form between Ventura Blvd. and Santa Monica Blvd.  Personally, I'd extend it from the Orange Line to Wilshire Blvd. (Purple Line), but I am grateful to see it survive it at all.


To review, the NextGen Bus Plan essentially takes the Rapid and Limited bus lines and combines them with their respective Local bus lines to create a more frequent overall service.  This approach has worked in improving ridership in other regions.  Here are the lines most relevant to West Hollywood:

Rapid 704 and Local 4 are combined into new frequent Line 4


Limited 302 and Locals 2 and 200 are combined to form frequent Line 2.


Rapid 705 is combined with Local 105 into new frequent Line 105.


Limited 312 is combined with Local 212 to create new frequent Line 212.


The change I find most fascinating is the merging of Rapid 780 with Locals 217, 180, and 181 into one new powerhouse frequent Line 180.


"In my opinion, this new frequent Line 180 is really going to need bus lanes on Hollywood Blvd. between La Brea and Vermont to work operationally."  Hollywood Blvd. is being considered for a makeover anyway, so now is the time.  So many bus lines start and finish on Hollywood, coming and going from all directions, that bus lanes on it make practical sense to me.

Here is one for my friends in Malibu.  Line 534 turns into Line 134 and has more frequent service.



I look forward to seeing the NextGen Bus Plan put into operation so that we can enjoy a more frequent service.  I've shown the major plans affecting West Hollywood, but you can see all of the NextGen Plan Updates by clicking here.

Monday, January 13, 2020

How Metro's Proposed Frequent Bus "NextGen Transit First Service Plan" Could Affect West Hollywood

Metro is undergoing a redesign of its bus network called the NextGen Bus Study.  After a series of community meetings, a draft frequency-enhanced "Transit First Service Plan" has been released.







The basic strategy as I understand it is to fold all but three rapid lines into corresponding local service, but increase the stop spacing on these new combined lines to create a core network where "83% of Metro's riders" will be walking distance from a bus that has 5, 7, or 10 minute frequency all day.  This sort of transformation to bus service has proven successful in other regions.


There are tradeoffs to any overhaul of course.  Metro is trading losing speed on individual rapid trips for the gain of frequency of service on many lines.  However, when one includes the time spent waiting for a bus as part of overall travel time, this may be a trade off that balances out for many people.  Check out all of the proposed changes by clicking here.





Here is how West Hollywood is likely to affected by the bus service changes according to the draft:

Santa Monica Blvd:  The Rapid 704 would fold into the a more frequent Local 4, with unproductive stops removed.  (Note: this may end West Hollywood's one-seat ride to Union Station.)

Sunset Blvd:  The Limited 302 would fold into the Local 2, with unproductive stops removed.  At Alvarado, the 2 would run north-south.  (Note: this would create a one-seat ride between UCLA and USC.)

Fairfax Avenue:  The Rapid 780 would be combined with the Local 180 and Local 217, for one new 180 line that runs from Pasadena City College to Hollywood Blvd., and then down Fairfax to the La Cienega "E (Expo) Line" Station.

La Cienega Blvd:   The Rapid 705 would fold into the Local 105, with unproductive stops removed.

San VicenteLine 30 would no longer run up San Vicente to West Hollywood, but Line 14 would.

La BreaThe Limited 312 would be folded into the Local 212, with unproductive stops removed.

Crescent Heights:  Once proposed change I do not agree with is the elimination of Line 218 which currently runs over-the-hill between Laurel Canyon & Ventura Blvd. and Cedar Sinai Hospital via Laurel Canyon, Crescent Heights, Fairfax, and 3rd Street.  Elimination of this service would require new time consuming forced transfers for current Line 218 passengers on both sides of the mountain.  I suggest that Metro try redesigning the service first.  One proposal would cut out the 3rd Street portion, but extend the line north to the Orange Line, and run Line 218 between the Laurel Canyon Orange Line Station and The Grove, and see if feeding to/from the Orange Line improves overall performance.  Another possibility would be to extend the 230 south over the hill to Santa Monica Blvd.  I hope Metro considers these alternatives before scrapping a valuable, direct over-the-hill service entirely.



One thing that will be needed to make this bus network overhaul work:  BUS LANES!  Southern California needs a comprehensive network of color-painted and enforced bus lanes to compliment our (thankfully) growing and expanding Metrorail and Metrolink networks.

There are another series of upcoming community workshops on this frequent "NextGen Transit First Service Plan" all over the County over the next several weeks, including one in West Hollywood, on Wednesday, February 12, 2020, 4 – 7 PM, at Plummer Park, 7377 Santa Monica Blvd., West Hollywood, CA 90046 (Accessible via Metro Lines 4/704; and Weho Cityline).

Click here to find an upcoming community workshop near you.  You may send in your comments and suggestions about this plan to Metro at nextgen@metro.net. 



Thursday, October 10, 2019

Why I like the "Hybrid" Option for the Crenshaw Northern Extension Project

As we get closer to Metro selecting a "Locally Preferred Alternative" for the Crenshaw Northern Extension Project, a new round of community meetings is about to take place.  On the menu for discussion will be a new "hybrid" option (seen below).



The more I study the "hybrid" alignment (A2 plus A/A1 above) for the Crenshaw Northern Extension Project the more I like it. At first the geometry of the line threw me, but this option hits all the major job/entertainment/retail generators north of Wilshire.


Going to where people actually want to go is what will make this line the tremendous success it is destined to be.  People don't just travel through this area, they travel TO this area and within this area.

Let's just remember why we need this line.  It intersects so many other Metro lines (Green, Expo, Purple, Red) and major bus corridors (Santa Monica, La Cienega, Fairfax,,etc.) that it will increase ridership on the whole system.  Plus, this extension will vastly increase mobility for disadvantaged communities with direct connections to job and entertainment centers like Cedars-Sinai, Beverly Center, The Grove, and West Hollywood.

There is a minority of people out there that prefer La Brea for this alignment. They look at La Brea on the map, see a "straighter" line, and say, "We want speed, speed, speed!  They don't seem to care about direct access to any of the ridership generators between Wilshire Blvd. and Hollywood Blvd. further west (like Cedar Sinai, the Beverly Center, the Grove, West Hollywood, etc.).  This is why I do not agree with them:

As a daily user of the transit system I think to myself, "If the options are: (A) riding a few more minutes underground to go directly to the location I actually want to go (West Hollywood, Cedar Sinai, Beverly Center, The Grove, etc.), or, (B) getting off the train at La Brea and THEN waiting above ground to transfer to a bus and THEN riding through heavy surface traffic to finally get where I actually want to go, well (B) really does not seem like the "speed" option after all, does it?

I'm sure a nurse riding from Leimert Park to her job at Cedar Sinai would rather take a quick one-seat ride underground rather than ride to Beverly/LaBrea, wait for a bus at LaBrea for however long, and then ride stop and go in heavy traffic to finally get to her job.  When you conceive the whole trip, the notion of the "speediest" option changes.

I say build this line and put the alignment directly stopping where people actually want to go.  And make its northern terminus at the Hollywood Bowl to help relieve nighttime Hollywood Bowl traffic there.

I believe the few extra minutes of curves required to make these stops, which no one will notice or care about underground, will still be MUCH quicker than sitting in heavy surface traffic above ground, and will not at all be a deterrent to its success.

I also reject talk of breaking this project up separately into “two-lines” as there is only going to be one line built in this area for decades.  By the time all of the current Measure R and Measure M projects are finished it will be decades for a second line is even proposed.  So don't be fooled or distracted by those people advocating a  so-called "speed" line on La Brea today while leaving second "access" line to be proposed and built at some vague date decades later (or never).

There are also those who will wonder, "what about the people traveling from the San Fernando Valley to LAX?"  Good question! I think most of them will likely use the coming Sepulveda Transit Corridor Project (seen below), but will still find this hybrid underground alignment MUCH quicker than sitting in surface traffic.


The next round of Metro Community Meetings for this project are soon.

Tuesday, October 22, 2019, 6 – 8 p.m.
Plummer Park, 7377 Santa Monica Blvd. West Hollywood, CA 90046.
Accessible via: West Hollywood Cityline and Metro bus lines 2, 4, 212, and 704.

Thursday, October 24, 2019, 6 - 8 p.m.
Wilshire Crest Elementary School, 5241 W. Olympic Blvd. Los Angeles, CA 90036.
Accessible via: Metro bus lines 20, 28, 212, 312, 720 and 728.

Saturday, October 26, 2019, 10 a.m.  – 12 p.m.
Virginia Road Elementary School, 2925 Virginia Road, Los Angeles, CA 90016.
Accessible via: DASH, Metro Bus lines 37, 38, 210, 710 and 740.

Tuesday, October 29, 2019, 6 – 8 p.m.
Rosewood Avenue Elementary School, 503 N. Croft Ave. Los Angeles, CA 90048.
Accessible via: DASH, West Hollywood Cityline and Metro bus lines 10, 14, 105 and 705

I will see you there!  You can also submit your feedback about this line to crenshawnorth@metro.net.

Although I very proudly sit on the City of West Hollywood's Transportation Commission, this blog post is my own opinion.  I am not claiming to speak for the Commission, the City Council, or our hardworking city staff.  

Monday, July 22, 2019

Homelessness and Public Transit in Southern California -- What is the answer?

Homelessness is not only a housing issue, but a public transportation issue too. Here is shiny new bus stop seating right across the street from West Hollywood City Hall that no paying or prospective transit passenger on their morning commute can use because it has been taken over by a sleeping homeless person.


Other scenarios people who use transit are all too familiar with:
- A homeless person takes up multiple seats with their belongings forcing other people to stand.
- A homeless person either under the influence of alcohol/drugs and/or is mentally ill is disruptive and threatening to other passengers.
- A homeless person who hasn't bathed in several days makes for an unpleasant ride for everyone else around him on the bus.

This post is not meant to be a general complaint about "the homeless".  I have tremendous compassion for homeless people.  We are speaking of  flesh and blood human beings here who deserve our consideration and respect and help.

However, allowing homeless people to take over public transit infrastructure hardly seems fair to the paying transit passengers who deserve safe, clean, comfortable rides.  (If you are someone who drives a single-occupancy automobile thinking, "Well, what's the problem?  I'd stand for a homeless person,"  I'd ask you in return, "how often do you have to?"  It's easy to invoke someone else's inconvenience in the name of one's own compassion.)

When increased homelessness spills onto the transit system and its infrastructure, it suppresses transit ridership because it makes the journey less comfortable and for some people less safe.  So then some people who can afford to opt out of the system, do.  I don't have any raw numbers, but I certainly have an endless supply of anecdotal evidence from people who tell me this is one of the reasons they personally avoid using transit or have stopped using transit.

There are two basic visions of public transit I come across:

(A)  "Public transit is method of moving masses of people of all classes and demographics conveniently from place to place, increasing mobility, cultural opportunity, and economic prosperity, while helping the environment and quality of life for all by providing an reliable alternative for people who would otherwise exacerbate traffic problems by driving more cars on our already clogged roads."

(B)  "Public transit is a form of "transportation welfare" meant to provide a subsistence level of mobility to poor people who would, of course, get their own automobile as soon as they have the means and opportunity."

Too many people think of transit in Southern California solely as (B) and therefore don't see the problem here.  Having lived in New York, and other cities, I envision transit as (A), and that is why I seek to improve it for everyone in the Southern California region, because I see everyone as a potential user.

However, it is increasingly clear to me that unless we do a better job of addressing the issue of homelessness in Southern California, our best efforts to improve transit here are going to be inhibited.  In essence, those of us who are transit advocates need to become homelessness advocates out of necessity.

What is the scale of the homelessness problem in Los Angeles?  The Los Angeles Homeless Services Authority (LAHSA) estimated 59,000 people on the streets of Los Angeles County.  That is truly a heartbreaking number.

So how can we solve this?  The City of West Hollywood addresses homelessness with a multi-disciplinary, multi-agency, collaborative response.   The City also has a five year plan to address homelessness.

However, no one city or one community can solve the issue of homelessness for the whole region.  All of us in Southern California need to do our part, and every community in Los Angeles County needs to do its part too.

In March 2017, Los Angeles County voters passed Measure H to raise money to address the issue of homelessness.  Los Angeles County also has 47 Strategies to Address Homelessness.

What do you think?   Constructive and compassionate solutions welcome.

-----

Edited to add:  A Social Services Manager from the City of West Hollywood has informed me that if we see a homeless community member in West Hollywood who we would like to help, please call WeHo’s homeless concern line at 323-848-6590. They will meet the homeless community member where they are at and offer services to help get them off the street. 

Metro Los Angeles has a homeless task force.  An article about how Metro is expanding its homeless services appeared in the Santa Monica Daily Press on June 1, 2019.  Please click here to read it.  


Tuesday, July 2, 2019

Take WeHo's Cityline's Shortline on Saturday Night

This past Saturday night I was getting ready to head downtown for a night of dancing and frivolity when I remembered the City of West Hollywood's Cityline bus has a new Saturday evening shuttle service called the Shortline, which transports people point-to-point to/from the Red Line Station at the southwest corner of Hollywood and Highland to/from the southeast corner of Santa Monica Blvd. and Crescent Heights.

The shuttle service is free(!) and runs from 7:30 PM to 1:00 AM, every 10-12 minutes.

Why? Crescent Heights?

Take a look at these maps of the free entertainment shuttles for the Pickup Line and Sunset Trip in West Hollywood.





You can transfer between the Shortline and either of these shuttles at Crescent Heights.

The service worked beautifully.  I look forward to this new and easy way to getting to/from the Red Line on Saturday nights.
    

A Look at Metrorail's Crenshaw/LAX Northern Extension Project to West Hollywood and Hollywood



Metro is currently studying extending its coming Crenshaw/LAX light-rail line, which is expected to open year, further north to Mid-City, West Hollywood and Hollywood.  This Northern Extension would provide a mighty north-south rail transit corridor connecting four rail lines (Green, Expo, Red and Purple) -- five if you count the Sepulveda Transit Corridor Project under study.

Following this Feasibility/Alternatives Analysis of five potential alignments for the Northern Extension (seen below), Metro will now preparing an Advanced Alternatives Screening Study to gather public input and further analyze the five alignments to help determine which alternatives will be studied further in a subsequent environmental analysis.



Measure M allocates $2.24 billion to the project, with a groundbreaking date of 2041 and project completion date of 2047. Metro is conducting this study now as there are efforts underway to identify funding to accelerate this schedule.  ALL projects look for additional funding to speed construction.  Please do not be daunted by the currently scheduled completion date.   That can and will be moved up.  This project can certainly be made shovel ready soon.

Metro has been holding a series of community meetings about this project.  I went to the first one and it was exciting to see a room full of people eager and excited for a Metrorail project to be built and built soon.

One of the things I learned is that Metro expects this line when completed to be one of the heaviest used light rail lines in the country, with its connection to five Metro rail lines, LAX, Hollywood, West Hollywood, and major bus corridors.  That sounds like an excellent reason to find the funding to speed up construction, doesn't it?  Perhaps even by the Olympics in 2028.



One of the things mentioned by Metro is that the further west the proposed alignment, the more job centers that are accessed by it.  When I inquired if the alternative analysis had studied nighttime ridership, they mentioned it had not.  We know that this area has a large number of nighttime riders and employment.  Any late night ride on a crowded 4/704 bus will tell you that.  Hopefully, Metro will choose alignment A or B.  C is another meritable choice.   My personal opinion is that LaBrea is too far east and misses too many ridership generators such as The Grove, Cedar Sinai hospital, and the Beverly Center.  Also, based on these numbers in the Feasibility Analysis I would be surprised if the Vermont alignment makes it any farther in the studies for this project.  There is, however, a separate Vermont Corridor project underway.

Metro has one more community meeting scheduled for this phase of the process -- Thursday, March 28, 2019, 6 – 8 p.m. West Hollywood Library, 625 N. San Vicente Blvd. West Hollywood, CA 90069. Accessible via: DASH, West Hollywood Cityline and Metro bus lines 4, 10, 16, 30, 105 and 704. There is limited street parking and a parking lot available.

EDITED TO ADD:  I attended the March 28th meeting and heard the following:  "The Fairfax alignment accesses twice the number of jobs as the La Brea alignment, and the La Cienega / San Vicente alignments have twice the number of that."

Please check out Metro's website for the Crenshaw Northern Extension at metro.net/crenshawnorth and if you cannot attend, please let Metro know by email that you support this project and which alignment you support (hopefully "A/B" or at least "C") at crenshawnorth@metro.net.

Originally published on March 27, 2019
  

Tuesday, July 11, 2017

New West Hollywood Transportation Video

Here is a great video created by the City of West Hollywood about various transportation options provided by the City.



Thursday, February 18, 2016

WHAM (West Hollywood Advocates for Metro Rail)

West Hollywood is putting its efforts on bringing the Metrorail to West Hollywood through an alignment connecting the under construction Crenshaw/LAX line with the Hollywood/Highland Red Line station.







Full disclosure.  I joined WHAM.  www.whamrail.com 


I hope you do too.



Thursday, November 19, 2015

West Hollywood's New Flyer to Advocate for Metrorail

As a current member of the West Hollywood Transportation Commission, I cannot and will not discuss items appearing before the commission in my blog.  However, I was told at last night's meeting that I can share the following with you.

Below are two sides of a draft flyer that West Hollywood will be disseminating to advocate for bringing Metrorail to West Hollywood -- in this case as the connecting link between the Crenshaw/LAX line and the Red Line station at Hollywood/Highland.  The proposed connection with the Purple Line would be a transfer between a proposed SanVicente/Wilshire station and the coming LaCienega/Wilshire Purple Line station.


Fun huh!.